The Challenges

BEST was selected to remove and replace existing roofing system at the Student Union building using a Tremco Cold BUR system over a total area of 34,800 square feet at four different areas, including the main building, upper penthouse, lower horseshoe and three small arcade roofs.

if 1

Project Data

Building Use: Educational
Scope of Work: Built-up Roofing (Cold)
Location: Long Beach, CA
Owner: CSU Long Beach
Project Value: $593,600