The Challenges

BEST has partnered with McCarthy Building Companies Inc. to work on this Hawthorne High School, Phase 1 of the Science Engineering, Media Arts and Student Service building project. The architect for this project is WLC Architects Inc.

BEST was selected to furnish and install the roofing system and sheet metal for this project. A modified built up roofing system and manufactured metal roofing panels were installed over approximately 75,000 square feet of total roof area at 6 different locations. Approximately 2,738 LF of factory-formed, nonporous, heavy duty, slip resisting walkway pads were installed. In addition, BEST also installed sheet metal flashing, trim gutters and downspouts, roof hatches, expansion joints, joint sealants and louvers for this project.

Project Data

Building Use: Education
Scope of Work: Roofing, Sheet Metal
Location: Hawthorne, CA
Owner: Centinela Valley Union High School District
General Contractor: Mccarthy Buildings
Project Value: $1,318,050
Completion Date: On Going