by admin | Mar 4, 2025
UC Davis Robbins Hall The Challenges BEST was selected to furnish and install 19,800 square feet of Sarnafil 60 mil smooth PVC roof system on the upper main roof, along with new parapet base and curb flashings, PVC pipe penetrations, prefabricated outside corners,...
by admin | Mar 4, 2025
Anaheim High School Gym & Administration Building The Challenges BEST was selected to remove and replace 54,500 square feet of existing roofs with Tremco Fluid Applied Membrane and SBS Modified Bituminous Roofing. Project Data Building Use: Education Scope of...
by admin | Apr 29, 2022
Vineyard Jr. High School Modernization The Challenges BEST was selected to furnish and install more than 95,000 square feet of Henry H1-PRMR Monolithic Surfaced Polyester Reinforced Maintenance System at designated areas. Additional scope of work included installation...
by admin | Apr 27, 2022
Edendale Middle School The Challenges BEST was selected to remove approximately 8,500 square feet of existing roof material at the New Southern Building and Music Room, as well as 72,700 square feet on the Main Building roof surface and replace with Garland SBS...
by admin | Apr 21, 2022
Legacy Magnet School The Challenges With a focus on Technology, Innovation, Design and Entrepreneurship (TIDE) Legacy Magnet opened in the Fall of 2020 and currently serves 6th grade through 9th grade students and will add 10th grade classes in 2021-2022. BEST was...