by admin | Oct 13, 2020
Hermosa Valley & Hermosa View Elementary School The Challenges Roof Replacement and Restoration at Hermosa Valley Elementary School consisted of removal of existing roof system at various locations, including Office, Tech Lab, Canopy, Gym and Library and...
by admin | Oct 13, 2020
Santa Monica College Central Plant Loop The Challenges As part of the Facilities 2010 Master Plan funded by various Measures, and budgeted at a cost of more than $11,206,000, construction to connect and retrofit 5 buildings with the Central Plant began in 2016. BEST...
by admin | Oct 13, 2020
Sinaloa Middle School West Building The Challenges BEST was selected to remove existing roofing material and replace with WeatherWeld R-1P-16-45A Gravel Roof System at Buildings 2, 3 and 4, including covered walkways, totaling 37,500 square feet. BEST also installed...
by admin | Oct 13, 2020
UC Santa Barbara San Joaquin Apartments – North Village Clusters The Challenges Part of UCSB’s Long Range Development Plan, the San Joaquin Apartment project is the newest addition to the UCSB student housing system achieving LEED Platinum Certification upon...
by admin | Oct 13, 2020
Alta Loma High School – Building F The Challenges BEST was selected to tear-off existing roofing membrane and removal of asbestos containing material on the boys/girls locker room and small gym portion of “F” Building, and re-roof with Sarnafil Adhered PVC...