Hermosa Valley & Hermosa View Elementary School

Hermosa Valley & Hermosa View Elementary School

Hermosa Valley & Hermosa View Elementary School The Challenges Roof Replacement and Restoration at Hermosa Valley Elementary School consisted of removal of existing roof system at various locations, including Office, Tech Lab, Canopy, Gym and Library and...
Santa Monica College Central Plant Loop

Santa Monica College Central Plant Loop

Santa Monica College Central Plant Loop The Challenges As part of the Facilities 2010 Master Plan funded by various Measures, and budgeted at a cost of more than $11,206,000, construction to connect and retrofit 5 buildings with the Central Plant began in 2016. BEST...
Sinaloa Middle School West Building

Sinaloa Middle School West Building

Sinaloa Middle School West Building The Challenges BEST was selected to remove existing roofing material and replace with WeatherWeld R-1P-16-45A Gravel Roof System at Buildings 2, 3 and 4, including covered walkways, totaling 37,500 square feet. BEST also installed...
Alta Loma High School – Building F

Alta Loma High School – Building F

Alta Loma High School – Building F The Challenges BEST was selected to tear-off existing roofing membrane and removal of asbestos containing material on the boys/girls locker room and small gym portion of “F” Building, and re-roof with Sarnafil Adhered PVC...