by admin | Oct 13, 2020
Sinaloa Middle School West Building The Challenges BEST was selected to remove existing roofing material and replace with WeatherWeld R-1P-16-45A Gravel Roof System at Buildings 2, 3 and 4, including covered walkways, totaling 37,500 square feet. BEST also installed...
by admin | Oct 13, 2020
UC Santa Barbara San Joaquin Apartments – North Village Clusters The Challenges Part of UCSB’s Long Range Development Plan, the San Joaquin Apartment project is the newest addition to the UCSB student housing system achieving LEED Platinum Certification upon...
by admin | Oct 13, 2020
Alta Loma High School – Building F The Challenges BEST was selected to tear-off existing roofing membrane and removal of asbestos containing material on the boys/girls locker room and small gym portion of “F” Building, and re-roof with Sarnafil Adhered PVC...
by admin | Oct 13, 2020
Golden West College Student Services The Challenges Part of the multi college campus sites in the Coast Community College District, construction of the new 51,969 square foot Student Services Building began in 2014 with funds from Measure M. BEST was selected to...
by admin | Oct 13, 2020
Abraham Lincoln High School Bldg A The Challenges First opened in 1940, Abraham Lincoln High School was initially a three-story building with 50 classrooms, library, cafeteria and football field. Noted as a California Distinguished pubic high school, Abraham Lincoln...