Orange High School Building 600

Orange High School Building 600

Orange High School Building 600 The Challenges BEST was selected to remove and replace 9,600 square feet of existing roofing with APOC Cold Applied Built Up Roofing on Building 600. Project Data Building Use: Education Scope of Work: Cold Applied Built-Up Roofing...
Smith Elementary School – K Building

Smith Elementary School – K Building

Smith Elementary School – K Building The Challenges BEST was selected to remove existing roofing system down to plywood decking and install 4,500 square feet Garland modified bituminous membrane roofing at designated areas. Project Data Building Use: Education...
UC Davis Robbins Hall

UC Davis Robbins Hall

UC Davis Robbins Hall The Challenges BEST was selected to furnish and install 19,800 square feet of Sarnafil 60 mil smooth PVC roof system on the upper main roof, along with new parapet base and curb flashings, PVC pipe penetrations, prefabricated outside corners,...
Anaheim High School Gym and Administration Building

Anaheim High School Gym and Administration Building

Anaheim High School Gym & Administration Building The Challenges BEST was selected to remove and replace 54,500 square feet of existing roofs with Tremco Fluid Applied Membrane and SBS Modified Bituminous Roofing. Project Data Building Use: Education Scope of...
Vineyard Jr. High School Modernization

Vineyard Jr. High School Modernization

Vineyard Jr. High School Modernization The Challenges BEST was selected to furnish and install more than 95,000 square feet of Henry H1-PRMR Monolithic Surfaced Polyester Reinforced Maintenance System at designated areas. Additional scope of work included installation...